Line Statistics
Avg moving: 16.3 km/h
Avg trip: 9.9 km/h
Median moving: 15.0 km/h
Median trip: 4.2 km/h
Peak: 33.6 km/h
P25: 7.8 ยท P75: 23.4
Stops: 64 total
Total delay: 676s
Tram stops:15 × avg 6s = 94s
Traffic lights:18 × avg 7s = 127s
Combined:30 × avg 15s = 450s
Bottlenecks:1 × avg 6s = 6s
Avg wait per stop: 27s
Trip duration scenarios:
Current avg:
27:42
Best case (no TL + no bottlenecks):21:58 (-5:44, -20.7%)
Signal priority (no TL waits):22:04 (-5:39, -20.4%)
Worst case (all reds):32:08 (+4:26, +16.0%)